Cart 0
Aquifer Storage and Recovery in the Comprehensive Everglades Restoration Plan
Click to zoom

Share this book

Aquifer Storage and Recovery in the Comprehensive Everglades Restoration Plan : A Critique of the Pilot Projects and Related Plans for Asr in the Lake Okeechobee and Western Hillsboro Areas

Book Details

Format Paperback / Softback
ISBN-10 0309073472
ISBN-13 9780309073479
Publisher National Academies Press
Imprint National Academies Press
Country of Manufacture GB
Country of Publication GB
Publication Date Mar 9th, 2001
Print length 74 Pages
Ksh 8,450.00
Publisher Out of Stock 0 in stock

Delivery Location

Delivery fee: Select location

Secure
Quality
Fast
Aquifer storage and recovery (ASR) is a process by which water is recharged through wells to an aquifer and extracted for beneficial use at some later time from the same wells. ASR is proposed as a major water storage component in the Comprehensive Everglades Restoration Plan (CERP), developed jointly by the U.S. Army Corps of Engineers (USACE) and the South Florida Water Management District (SFWMD). The plan would use the Upper Floridan aquifer (UFA) to store as much as 1.7 billion gallons per day (gpd) (6.3 million m3/day) of excess surface water and shallow groundwater during wet periods for recovery during seasonal or longer-term dry periods, using about 333 wells. ASR represents about one-fifth of the total estimated cost of the CERP. Aquifer Storage and Recovery in the Comprehensive Everglades Restoration Plan examines pilot project from the perspective of adaptive assessment, i.e., the extent to which the pilot projects will contribute to process understanding that can improve design and implementation of restoration project components. This report is a critique of the pilot projects and related studies.

Aquifer storage and recovery (ASR) is a process by which water is recharged through wells to an aquifer and extracted for beneficial use at some later time from the same wells. ASR is proposed as a major water storage component in the Comprehensive Everglades Restoration Plan (CERP), developed jointly by the U.S. Army Corps of Engineers (USACE) and the South Florida Water Management District (SFWMD). The plan would use the Upper Floridan aquifer (UFA) to store as much as 1.7 billion gallons per day (gpd) (6.3 million m3/day) of excess surface water and shallow groundwater during wet periods for recovery during seasonal or longer-term dry periods, using about 333 wells. ASR represents about one-fifth of the total estimated cost of the CERP.

Aquifer Storage and Recovery in the Comprehensive Everglades Restoration Plan examines pilot project from the perspective of adaptive assessment, i.e., the extent to which the pilot projects will contribute to process understanding that can improve design and implementation of restoration project components. This report is a critique of the pilot projects and related studies.


Get Aquifer Storage and Recovery in the Comprehensive Everglades Restoration Plan by at the best price and quality guaranteed only at Werezi Africa's largest book ecommerce store. The book was published by National Academies Press and it has pages.

Mind, Body, & Spirit

Shopping Cart

Africa largest book store

Sub Total:
Ebooks

Digital Library
Coming Soon

Our digital collection is currently being curated to ensure the best possible reading experience on Werezi. We'll be launching our Ebooks platform shortly.