Cart 0
ICOLD Dam Decommissioning - Guidelines
Click to zoom

Share this book

ICOLD Dam Decommissioning - Guidelines

Book Details

Format Paperback / Softback
ISBN-10 1138491209
ISBN-13 9781138491205
Publisher Taylor & Francis Ltd
Imprint CRC Press
Country of Manufacture GB
Country of Publication GB
Publication Date Oct 17th, 2018
Print length 144 Pages
Weight 264 grams
Dimensions 15.60 x 23.40 x 1.80 cms
Product Classification: Dams & reservoirs
Ksh 20,700.00
Werezi Extended Catalogue Delivery in 28 days

Delivery Location

Delivery fee: Select location

Delivery in 28 days

Secure
Quality
Fast

The topic of dam decommissioning or dam removal has come up with increasing frequency in the past decade. The reason for considering dam removal may be dam safety concerns, high repair costs, high operation and maintenance costs, or impacts on fish passage and water quality. This ICOLD Bulletin provides owners of dams, dam technicians and other professionals with the information needed to guide decision making when considering dam dismantling as a project alternative.

Dam decommissioning or dam removal has been increasingly common since the past decade. The reason for considering dam removal may have to do with the safety of dams, high repair costs, high operating and maintenance costs, or effects on fish passage and water quality. However, the decision to remove a dam must be based on careful evaluation of the alternatives to address the specific problem at each dam.

The ICOLD Committee for decommissioning dams was established in 2005 to develop information that can be used by ICOLD members to respond to questions about the dismantling of dams and to provide a forum for the exchange of information . This ICOLD Bulletin is not intended as a design guide, but as a guide to the decision making process, consultation and regulatory approvals, design and construction issues, sediment management and performance monitoring.

The primary aim of these Dam decommissioning guidelines is to provide dam owners, dam engineers and other professionals with the information needed to guide decision making when considering dam dismantling as a project alternative. They are not meant to be used as a design guide, but as a guide to highlighting the points of interest. The guidelines in this ICOLD Bulletin apply only to flood defense structures and not to fall dams.


Get ICOLD Dam Decommissioning - Guidelines by at the best price and quality guaranteed only at Werezi Africa's largest book ecommerce store. The book was published by Taylor & Francis Ltd and it has pages.

Mind, Body, & Spirit

Price

Ksh 20,700.00

Shopping Cart

Africa largest book store

Sub Total:
Ebooks

Digital Library
Coming Soon

Our digital collection is currently being curated to ensure the best possible reading experience on Werezi. We'll be launching our Ebooks platform shortly.