Reducing Peak RDII Flow Rates : Case Studies and Protocol
by
S. Merrill
Book Details
Format
Paperback / Softback
Book Series
WERF Research Report Series
ISBN-10
1843396521
ISBN-13
9781843396529
Publisher
IWA Publishing
Imprint
IWA Publishing
Country of Manufacture
GB
Country of Publication
GB
Publication Date
Jun 30th, 2003
Print length
170 Pages
Dimensions
23.40 x 15.60 x 1.80 cms
Product Classification:
Water supply & treatment
Ksh 26,100.00
Publisher Out of Stock
0 in stock
Delivery Location
Delivery fee: Select location
Secure
Quality
Fast
The purpose of this research project was to examine construction projects that successfully reduced Rainfall Dependent Infiltration/Inflow (RDII). The research began with a literature review of all published records describing RDII removal projects. Initially, the review identified many projects; however, subsequent evaluation of available information revealed several important realities. First, most RDII removal projects in the country go undocumented. Second, of the RDII removal project summaries that have been published, few provide good data. Third, data gathering and analyses for this report were hampered by lack of documentation, lost or unavailable monitoring data, and weaknesses in monitoring techniques. Projects with sufficient information describing the conditions before the RDII removal project received a detailed analysis. In all, the case studies from the six agencies presented in this report (1) document before-and-after RDII levels, (2) quantify the RDII reduction achieved, and (3) describe the cost-effectiveness of the removal. As more than one project was documented for some agencies, a total of 12 RDII projects received review. The projects examined include both those that ?successfully? reduced RDII and those that did not. In general, the conclusion was that utilities run the risk of not removing significant RDII unless they address private sewer laterals. The only cases examined where significant RDII was removed were those that addressed private sewers or inflow sources. A major recommendation of this report was to establish a standard reporting protocol for documenting RDII removal projects. This protocol details what specific information should be provided when documenting an RDII removal project and how to perform an evaluation of RDII removal effectiveness. The protocol touches on issues ranging from flow meter maintenance to statistical analysis of flow data. By using the proper documentation recommended in this report, communities allow others who are preparing to perform similar work to examine and utilize the results of any RDII removal project. This publication can also be purchased and downloaded via Pay Per View on Water Intelligence Online - click on the Pay Per View icon below
The purpose of this research project was to examine construction projects that successfully reduced Rainfall Dependent Infiltration/Inflow (RDII). The research began with a literature review of all published records describing RDII removal projects. Initially, the review identified many projects; however, subsequent evaluation of available information revealed several important realities. First, most RDII removal projects in the country go undocumented. Second, of the RDII removal project summaries that have been published, few provide good data. Third, data gathering and analyses for this report were hampered by lack of documentation, lost or unavailable monitoring data, and weaknesses in monitoring techniques. Projects with sufficient information describing the conditions before the RDII removal project received a detailed analysis. In all, the case studies from the six agencies presented in this report (1) document before-and-after RDII levels, (2) quantify the RDII reduction achieved, and (3) describe the cost-effectiveness of the removal. As more than one project was documented for some agencies, a total of 12 RDII projects received review. The projects examined include both those that ?successfully? reduced RDII and those that did not. In general, the conclusion was that utilities run the risk of not removing significant RDII unless they address private sewer laterals. The only cases examined where significant RDII was removed were those that addressed private sewers or inflow sources. A major recommendation of this report was to establish a standard reporting protocol for documenting RDII removal projects. This protocol details what specific information should be provided when documenting an RDII removal project and how to perform an evaluation of RDII removal effectiveness. The protocol touches on issues ranging from flow meter maintenance to statistical analysis of flow data. By using the proper documentation recommended in this report, communities allow others who are preparing to perform similar work to examine and utilize the results of any RDII removal project. This publication can also be purchased and downloaded via Pay Per View on Water Intelligence Online - click on the Pay Per View icon below
Get Reducing Peak RDII Flow Rates by at the best price and quality guaranteed only at Werezi Africa's largest book ecommerce store. The book was published by IWA Publishing and it has pages.