Special Geotechnical Testing for Central Artery/tunnel Project in Boston, Massachusetts : Proceedings of Sessions of Geo-Congress 98, October 18-21, 1998, Boston, MA
Book Details
Format
Paperback / Softback
ISBN-10
0784404534
ISBN-13
9780784404539
Publisher
American Society of Civil Engineers
Imprint
American Society of Civil Engineers
Country of Manufacture
US
Country of Publication
GB
Publication Date
Jul 31st, 1999
Print length
192 Pages
Weight
230 grams
Product Classification:
Soil & rock mechanicsSoil and rock mechanics
Ksh 5,050.00
Werezi Extended Catalogue
0 in stock
Delivery Location
Delivery fee: Select location
Secure
Quality
Fast
The Central Artery/Tunnel Project (CA/T) in Boston, Massachusetts, is one of the largest urban highway construction projects in the history of the interstate system. This book discusses the various testing programs undertaken to answer technical questions related to design and construction of the Central Artery/ Tunnel Project in Boston.
The Central Artery/Tunnel Project (CA/T) in Boston, Massachusetts, is the largest urban highway construction project in the history of the interstate system. The magnitude and complexity of the project, set in the variable and difficult subsurface conditions of the 350-year-old city, have required engineers to develop unique and innovative solutions. These papers discuss the various testing programs undertaken to answer technical questions related to design and construction of the Central Artery/ Tunnel Project in Boston. The technical issues discussed include: dewatering and injection testing; load testing of deep rock-socketed drilled shafts; evaluating various test methods for determining shear strength of marine clay; assessing effectiveness of different methods of grouting to pre-stabilize ground beneath railroad tracks prior to tunnel jacking; determining capacity of deeply anchored, tension elements to resist hydrostatic uplift on boat and tunnel structures; and evaluating different means for instrumenting old subway tunnels to evaluate impacts of overhead excavation. Although the tests were specific to the CA/T project, their results have much wider implications for geotechnical design in many other situations.
Get Special Geotechnical Testing for Central Artery/tunnel Project in Boston, Massachusetts by at the best price and quality guaranteed only at Werezi Africa's largest book ecommerce store. The book was published by American Society of Civil Engineers and it has pages.